Gibraltar Design

Pike-Media-Room365

Case Studies

Cost Savings with Proper Engineering

The National Technical Trade Journal chose Gibraltar Design’s $12.4 million Engineering project design accomplishments at Portage Township Schools as its feature for initiatives in significant savings despite rising energy costs. “Given the scope of the job the retrofit were broken down into three phases: Phase I, with five …

Read More »